Cloud Migration
Staged migration with a rollback at every step, not a weekend cutover.
Detail
The risk in a migration is almost never the destination. It is the dependency nobody documented — the batch job that writes to a file share, the reporting tool with a hardcoded IP, the certificate that renews from a machine under someone’s desk.
So we map first. The dependency map usually changes the plan.
Stages, not a big bang
We move systems in an order that keeps the business running, and every stage has a rollback we have actually tested. A weekend cutover with no way back is a bet, and it is not one you need to take.
Lift-and-shift is sometimes correct
Rearchitecting during a migration doubles the number of things that can go wrong. Often the right sequence is to move it, stabilise it, then improve it — and we will say so even though the rewrite is the larger project.
Deliverables
What you get
- Dependency map of the current estate
- Migration sequence with rollback plan
- Landing zone and networking
- Data migration with verification
- Cutover runbook and support window